printer friendly version
FD-6045 & FD-8645

The Fire Deck oven should have
a minimum 1" (25mm) clearance to combustibles from all sides, and 24"
(610mm)
clearance to combustibles from the top for the FD-6045 & FD-8645.
If building materials will
contact the oven, they must be completely noncombustible. Please
note that standard drywall (or sheet rock) is considered a
combustible. WARNING: DO NOT pack the required air spaces with
insulation or other materials.
If the area directly above the doorway and
6" (152mm) to each side of the
doorway is to be covered with a facade, it must be of a non-combustible material.
Install this oven only on a
non-combustible floor which extends at least 36" (914mm) in front of
and 30" (762mm) to either side of the door.
All ovens equipped for stucco
application must have a clearance of 36" (914mm) to combustibles from all
sides and the top.
Top
printer friendly version
FD-9660 & FD-9690

The Fire Deck oven should have
a minimum 1" (25mm) clearance to combustibles from all sides, and
14" (356mm) clearance to combustibles from the top for the FD-9660 & FD-9690.
If building materials will
contact the oven, they must be completely noncombustible. Please
note that standard drywall (or sheet rock) is considered a
combustible. WARNING: DO NOT pack the required air spaces with
insulation or other materials.
If the area directly above the doorway and
6" (152mm) to each side of the
doorway is to be covered with a facade, it must be of a non-combustible material.
Install this oven only on a
non-combustible floor which extends at least 36" (914mm) in front of and
30" (762mm) to either side of the door.
All ovens equipped for stucco
application must have a clearance of 36" (914mm) to combustibles from all
sides and the top.

To get more ideas about how to facade your oven, look at our Custom Finishes and peruse our
Installation Photo Gallery
Top
| Unloading
& Moving |
Installation Solutions | Manuals |
| Venting | Facade Tutorials |
FAQs |
Start Up |
|
|